Home›Estimators

All 51 cost estimators

Every free tool on HomeEstimatorHub, grouped by trade, with a note on what each category of work involves and what you should have measured before you start.

  • 51 tools
  • All 50 states
  • No signup
  • Nothing stored
  • Published methodology

Construction & Building

7 tools

Building something new, rather than changing something that already exists. These tools price a structure from the ground up, so the two inputs that matter most are footprint and finish level — a bare pole barn shell and the same barn finished as living space can differ by a factor of three. Site access matters more here than in any other category, because everything has to be delivered and craned or carried into position.

What you’ll need: Dimensions in feet, intended use, finish level, and how easily a truck can reach the build site.

Kitchen, Bath & Interior

7 tools

Renovation work inside the existing walls. This is the category where your own choices drive the budget hardest — cabinets, countertops, tile and fixtures routinely account for more than half the total, and the spread between builder-grade and high-end is often two to three times. It is also where hidden conditions show up: old plumbing, undersized wiring, subfloor rot under a bathroom.

What you’ll need: Room dimensions, whether it is a cosmetic update or a full gut, and the grade of cabinets or fixtures you want.

Roofing & Exterior

8 tools

The building envelope — everything that keeps weather out. Priced mainly by surface area, then adjusted for the things that make that area harder to work on: pitch, number of stories, and how much has to come off before the new material goes on. A steep two-story roof is a materially different job from a low-slope ranch of the same square footage.

What you’ll need: Roof or wall area, the material you want, roof pitch, and the number of stories.

Foundation, Moisture & Structural

6 tools

The category with the widest ranges on this site, and deliberately so. Water and structural problems are rarely fully visible before work starts, and the repair that looked like crack injection can turn into piering once a crew opens the ground. Treat the low end of these ranges as the best case and budget nearer the middle.

What you’ll need: Affected area or linear feet, how severe the symptoms are, and where the water is coming from if you know.

Home Systems

8 tools

Mechanical, plumbing and electrical work. Unlike most renovation, equipment often costs more than the labor to fit it — a heat pump or a 400-amp panel is a significant hardware purchase. Nearly everything in this category is permitted and inspected work, and several items are not legal to do yourself.

What you’ll need: Home size or load, the capacity you need, and the age and type of what you are replacing.

Insulation & Energy

3 tools

The only category where the payback period matters as much as the price. These are the projects that lower a bill every month afterwards, so the useful question is not just what it costs but how long it takes to earn back. Federal energy credit rules changed recently — the relevant statute is linked on each tool rather than summarized here, because the detail matters.

What you’ll need: Area to be treated, your current insulation level if known, and the R-value or system size you are targeting.

Safety & Hazard Removal

4 tools

Licensed work, without exception. Asbestos, radon, mold and fire damage are regulated for good reason, and the sequence always starts with testing rather than removal — you cannot price abatement sensibly until you know what is actually there and how much of it. Nothing in this category is a DIY project, and these estimates assume certified contractors.

What you’ll need: Test results where you have them, the material or contaminant involved, and the affected area.

Outdoor & Landscaping

8 tools

Work beyond the walls of the house, priced by area for flatwork and by linear feet for fencing and walls. Site access is the big multiplier here: a backyard a mini-excavator cannot reach means the job is done by hand, which can change the labor figure substantially without changing the specification at all.

What you’ll need: Dimensions in feet or square feet, the material you want, and whether machinery can reach the area.

Choosing a tool

Which estimator do you actually need?

Several of these overlap on purpose. Here is how to tell them apart when more than one looks right.

Repair and replace are different tools

Where both exist, they are priced on completely different logic. A repair is scoped by how much damage there is; a replacement is scoped by the size of the whole thing. If you genuinely do not know which you need yet, run both — the gap between the two numbers is usually the most useful thing on the screen, because it tells you how long you can reasonably keep repairing before replacing becomes the cheaper path.

When a project spans several trades, run several tools

A finished basement is not one job. It is framing and drywall, possibly an egress window, possibly waterproofing first, and usually some electrical. The basement finishing estimator prices the finishing work; it does not assume you also need to solve a water problem. Where a project has a prerequisite — and moisture work almost always is one — price the prerequisite separately and add it.

Fix the cause before pricing the symptom

This matters most in the foundation and moisture category. Encapsulating a crawl space that still takes on water, or finishing a basement that leaks, means paying twice. If there is active water, price the drainage or waterproofing first and treat the finish work as the second phase.

The insurance calculator is not a project estimator

The home replacement cost calculator answers a different question from everything else here. It estimates what it would cost to rebuild your house from scratch, which is the number your dwelling coverage should be based on — not market value, and not what you paid. Use it to check whether you are underinsured, not to budget a renovation.

Words that get used loosely

Estimate, quote and bid are not the same thing

Knowing which one you have been handed is the difference between a budget and a commitment.

An online estimator gives you a planning figure

That is what every tool on this page produces. It is arithmetic over a researched rate table, adjusted for your state. Nobody is bound by it, it has not seen your house, and it is meant to tell you roughly what to budget and whether a bid you have received is in a sane range.

A written estimate is a contractor’s best guess

It is informed by an actual site visit, which makes it far better than anything online. It is still an estimate: it can move if conditions change. In most states an estimate is not a binding offer, and the final invoice can legitimately differ.

A quote or bid is a firm price

This is an offer to do a defined scope of work for a stated amount. Once you accept it, it becomes the contract price, and changes to it should come through written change orders rather than appearing on the final bill. If a document does not make clear which of these it is, ask before signing.

Fixed price versus time and materials

A fixed-price contract puts the risk of overruns on the contractor, which is why fixed prices carry a contingency built into them. Time and materials is billed as the work happens — often cheaper if the job runs smoothly, and open-ended if it does not. For work with unknowns behind a wall or under the ground, expect to be offered time and materials, and ask for a not-to-exceed cap.

Every number on this site is the first kind. The methodology page sets out the exact formula, the 50-state multiplier table, and what the range around each figure means.

Before you start

What to have to hand

None of these tools require an account and none of them store anything you type. They do get noticeably more useful if you have gathered a few things first:

  • Measurements, in feet. Square footage for areas, linear feet for fences, walls and gutters. A rough tape measurement beats a guess by a wide margin.
  • The age of the house. It drives what is likely behind the walls — and for anything involving demolition in a home built before 1980, it determines whether asbestos and lead testing come first.
  • Any test results you already have. A radon reading in pCi/L, a water hardness figure, a soil percolation result. Several tools price directly off these.
  • Your state, and whether you are rural, suburban or metro. Together these move the total by as much as 45% between the cheapest and most expensive combinations.
  • Photos of the problem area. Not for the calculator, but for the contractors you contact afterwards. It is the fastest way to get a useful reply.

None of these tools produce a quote. Each one returns a researched planning figure for your state, and a range showing how far that kind of work typically moves once a contractor has seen the site. Local permit rules, access and whatever is found behind the wall are outside what any calculator can know. Full disclaimer →